Abstract
The ASCE 7 Committee on Minimum Loads on Buildings and Other Structures is revising loads contained in ASCE 7-93. Significant revisions are proposed to wind load provisions. The revisions include new wind speed map, provisions for wind speed-up for topography, requirement for partial loading and refinement in exposure coefficients and gust response factor. Use of 3-second gust speed necessitates change in values of virtually all the coefficients.
Original language | English |
---|---|
Pages | 1859-1862 |
Number of pages | 4 |
State | Published - 1995 |
Event | Proceedings of the 13th Structures Congress. Part 1 (of 2) - Boston, MA, USA Duration: Apr 3 1995 → Apr 5 1995 |
Conference
Conference | Proceedings of the 13th Structures Congress. Part 1 (of 2) |
---|---|
City | Boston, MA, USA |
Period | 04/3/95 → 04/5/95 |