Increasing the production rate of a just-in-time production system with variable operation times

Ramiro Villeda, Richard Dudek, Milton L. Smith

Research output: Contribution to journalArticle

38 Scopus citations

Abstract

This paper examines a just-in-time (JIT) system with kanbans with three subassembly lines feeding a final assembly station. Variability in operation times exists and variability effects are reduced by increasing work in process levels or by unbalancing the subassembly lines through assignment of work content at each station. Of the several unbalancing methods that were analysed in this study, only the high-medium-low showed a consistent improvement in the output rate of the JIT production system. The output rates with unbalanced stations were always superior to the output rate of the perfectly balanced configurations used as controls. The extent of improvement over the output rate of balanced systems increased directly with the variability in operation times in final assembly and subassembly stations and inversely with the interstage buffer capacity allowed in the system.

Original languageEnglish
Pages (from-to)1749-1768
Number of pages20
JournalInternational Journal of Production Research
Volume26
Issue number11
DOIs
StatePublished - Nov 1988

Fingerprint Dive into the research topics of 'Increasing the production rate of a just-in-time production system with variable operation times'. Together they form a unique fingerprint.