TY - JOUR
T1 - Disassembly planning analysis for electromechanical products
AU - Kuo, Tsai C.
AU - Yu, Steve Y.
AU - Zhang, Hong C.
N1 - Copyright:
Copyright 2004 Elsevier Science B.V., Amsterdam. All rights reserved.
PY - 1997
Y1 - 1997
N2 - It has been recognized that appropriate disassembly of used products is necessary in order to make recycling economically and environmentally viable in the current state of the art reprocessing technology. This paper describes a graph-based heuristic approach to automatically generate the disassembly planning for electromechanical products. The planning is divided into four stages, geometric assembly representation, cut-vertex search analysis, disassembly precedence matrix analysis, and disassembly sequences and plan generation. A personal computer is used to illustrate the example of disassembly sequences generation.
AB - It has been recognized that appropriate disassembly of used products is necessary in order to make recycling economically and environmentally viable in the current state of the art reprocessing technology. This paper describes a graph-based heuristic approach to automatically generate the disassembly planning for electromechanical products. The planning is divided into four stages, geometric assembly representation, cut-vertex search analysis, disassembly precedence matrix analysis, and disassembly sequences and plan generation. A personal computer is used to illustrate the example of disassembly sequences generation.
KW - Cut-vertex search analysis
KW - Design for disassembly
KW - Disassembly sequences
UR - http://www.scopus.com/inward/record.url?scp=0031360940&partnerID=8YFLogxK
M3 - Article
AN - SCOPUS:0031360940
VL - 94
SP - 225
EP - 241
JO - American Society of Mechanical Engineers, Design Engineering Division (Publication) DE
JF - American Society of Mechanical Engineers, Design Engineering Division (Publication) DE
SN - 1521-4613
ER -