Projects per year
Search results
-
-
-
-
-
Determination of an Effective Lower Bound of Watershed Slope for Traditional Hydrologic Methods
09/1/08 → …
Project: Research
-
-
-
-
Irion and Sterling County Groundwater Evaluation
Uddameri, A., Uddameri, V., Cleveland, T., Uddameri, A., Uddameri, V. & Cleveland, T.
Project: Research
-
-
Modeling a change in flowrate through detention or additional pavement in the receiving stream
01/15/15 → …
Project: Research
-
-
-
Empirical Flow Parameters- A Tool for Hydraulic Model Validity Assessment
09/1/10 → …
Project: Research
-
-
-
-
-
15-77 Evaluating Use of Sub-Grade Drains with PFC for Stormwater Drainage
01/15/15 → …
Project: Research
-
City of Lubbock Canyon Lakes Water Reuse Project
Jackson, W., Cleveland, T., Anderson, T., Rainwater, K., Jackson, W., Cleveland, T., Anderson, T. & Rainwater, K.
01/25/10 → …
Project: Research
-
Develop Statewide Regression Equations for Improved Flood Peak Estimation
Cleveland, T., Rainwater, K., Cleveland, T. & Rainwater, K.
01/1/08 → …
Project: Research
-
Task 41 Hydrologic and Hydraulic Evaluation of Stormwater Drainage at Marsha Sharp Freeway and University Avenue
Cleveland, T. & Rainwater, K.
08/1/15 → …
Project: Research
-
-
-
-
-
-
-
estimating Time Parameters of Direct Runoff and Unit Hydrographs for Texas Watersheds
09/1/03 → …
Project: Research
-